USO DE PLANTILLAS PARA DESARROLLAR LA LINEA DE TIEMPO DE LOS PROCESOS Y ACCIONES COMO PROCEDIMIENTOS OPERACIONALES ESTANDARIZADOS

Author(s) BERNARDO ALIAGA
Doc Type Presentation
Status Published on 26 Jan 2012
Keywords PTWS, CADENA DE ALERTA, CRONOLOGIA
This document is in the list(s): ICG/PTWS Working Documents
This document is used in the event(s): TALLER SOBRE SISTEMA DE ALERTA TEMPRANA NACIONAL ANTE TSUNAMI Y SISTEMAS OPERACIONALES ESTÁNDAR_PERU

Group(s): Tsunami
Created at 13:13 on 26 Jan 2012 by Silvia Sermeno
Updated at 13:15 on 26 Jan 2012 by Silvia Sermeno
200 @ view_document
HTTP status 200 OK
Route name view_document
Has session yes
166 ms
Total time 166 ms
Initialization time 24 ms
2.0 MiB
Peak memory usage 2.0 MiB
PHP memory limit 512 MiB
293
Errors 0
Warnings 0
Deprecations 293
465 in 29.86 ms
Cache Calls 465
Total time 29.86 ms
Cache hits 382 / 438 (87.21%)
Cache writes 27
7
Default locale en
Missing messages 0
Fallback messages 0
Defined messages 7
anon.
Logged in as anon.
Authenticated Yes
Token class AnonymousToken
Firewall name main
21 ms
Render Time 21 ms
Template Calls 7
Block Calls 5
Macro Calls 0
12 in 27.59 ms
Database Queries 12
Query time 27.59 ms
Invalid entities 0
Second Level Cache disabled
4.4.51
Profiler token 783843
Environment dev
Debug enabled
PHP version 7.4.3   View phpinfo()
PHP Extensions xdebug ✗ APCu ✗ OPcache ✓
PHP SAPI apache2handler