JCOMM-MR-078, DMPA_ODP_meeting_WIGOS_04, ODP-WIGOS4-Final-Report

Third meeting of the Joint Steering Group for the IODE Ocean Data Portal and the JCOMM Pilot Project for WIGOS

Author(s) Secretariat
Summary Ostend, Belgium, 1-3 November 2010
Doc Type Report
Status Published on 12 Nov 2010
Notes The third meeting of the Joint Steering Group for the IODE Ocean Data Portal (ODP) and the JCOMM Pilot Project for WIGOS was held at the Project Office of the IOC International Oceanographic Data and Information Exchange (IODE) in Ostend, Belgium from 1 to 3 November 2010. The meeting reviewed the status of the WIGOS, including the WIGOS Concept of Operations (CONOPS), the WIGOS test of concept Development and Implementation Plan (WDIP), the WIGOS Development and Implementation Strategy (WDIS), and the status of the WIGOS Demonstration Projects. The meeting also reviewed the status of the JCOMM Pilot Project itself, and addressed outstanding issues, including (i) interoperability of ocean data systems with the IODE Ocean Data Portal and/or the WMO Information System (WIS), (ii) instrument practices and the review of WMO and IOC Technical Publications, (iii) quality management, and (iv) Capacity Building. Practical achievements of the Pilot Project include the following: ­ Establishment of a network of Regional Marine Instrument Centres in USA, China, and Morocco; ­ Review of marine chapters of key WMO Publications; ­ Enhanced links with the Association of Hydro-Meteorological Equipment Industry (HMEI) and the manufacturers of ocean instruments; ­ Connection of key ocean data sets to the IODE Ocean Data Portal; ­ Interoperability between the ODP and the WMO Information System (WIS); ­ Establishment of a standards process for ocean data management and submission of several standards through that process; ­ Organization of several training courses on instruments and data management. Considering the successful achievements of the Pilot Project, and realization of the test of concept for the integration of marine meteorological and other appropriate oceanographic observations into WIGOS, the meeting agreed that the Pilot Project should now come to an end by the end of this year. This was therefore the last meeting of the joint Steering Group. The meeting recognized that a number of activities will continue even after the official end of the Pilot Project through JCOMM and the IODE. A Project Report was drafted and reviewed by the joint Steering Group. The report includes information on the achievements of the Pilot Project, test of concept, pending issues, lessons learned, benefits and impacts on Members/Member States regarding the integration of marine meteorological and other appropriate oceanographic observations into WIGOS, as well as Pilot Project legacy recommendations. After consideration of the lessons learned, the meeting proposed some adjustments to the Pilot Project Report and legacy recommendations. The status of the Implementation Plan will also be updated and included in the Project Report. A small review group lead by the two co-Chairs of the Joint Steering Group will finalize the project report by the beginning of 2011.
Keywords ODP JCOMM Pilot Project WIGOS IODE Instrument Practices RMIC WIS interoperability quality management QMS QMF standards process legacy recommendations
This document is in the list(s): [Official JCOMM Publication] JCOMM Meeting Report Series
This document is used in the event(s): 2nd Session of the IODE Steering Group for the IODE Ocean Data Portal
Third Meeting of the Joint Steering Group for the IODE Ocean Data Portal and the WIGOS Pilot Project for JCOMM

Group(s): JCOMM
Created at 14:28 on 12 Nov 2010 by Etienne Charpentier
Updated at 12:49 on 11 Apr 2013 by Boram Lee
200 @ view_document
HTTP status 200 OK
Route name view_document
Has session yes
145 ms
Total time 145 ms
Initialization time 22 ms
2.0 MiB
Peak memory usage 2.0 MiB
PHP memory limit 512 MiB
38
Errors 0
Warnings 0
Deprecations 38
465 in 11.81 ms
Cache Calls 465
Total time 11.81 ms
Cache hits 382 / 438 (87.21%)
Cache writes 27
7
Default locale en
Missing messages 0
Fallback messages 0
Defined messages 7
anon.
Logged in as anon.
Authenticated Yes
Token class AnonymousToken
Firewall name main
20 ms
Render Time 20 ms
Template Calls 7
Block Calls 5
Macro Calls 0
12 in 28.65 ms
Database Queries 12
Query time 28.65 ms
Invalid entities 0
Second Level Cache disabled
4.4.50
Profiler token 7c1571
Environment dev
Debug enabled
PHP version 7.4.3   View phpinfo()
PHP Extensions xdebug ✗ APCu ✗ OPcache ✓
PHP SAPI apache2handler