OPA_DBCP_general_DBCP-WIO01_01, DBCP-WIO Buoy implementation

Buoy programme implementation

Author(s) Etienne Charpentier
Summary This presentation provides an overview of how to implement a buoy programme, including requirements and design aspects, budget considerations, and practical deployment aspects.
Doc Type Presentation
Status Published on 18 Apr 2010
Keywords DBCP buoy programme implementation TAO drifter SVP SVPB moored mooring
This document is in the list(s): [Working Documents] Observations Programme Area
This document is used in the event(s): 1st DBCP Africa/Western Indian Ocean Capacity Building Workshop

Group(s): JCOMM
Created at 15:48 on 18 Apr 2010 by Etienne Charpentier
Updated at 11:37 on 27 Oct 2010 by Sungmin O
200 @ view_document
HTTP status 200 OK
Route name view_document
Has session yes
447 ms
Total time 447 ms
Initialization time 22 ms
38.0 MiB
Peak memory usage 38.0 MiB
PHP memory limit 512 MiB
38
Errors 0
Warnings 0
Deprecations 38
465 in 36.74 ms
Cache Calls 465
Total time 36.74 ms
Cache hits 382 / 438 (87.21%)
Cache writes 27
7
Default locale en
Missing messages 0
Fallback messages 0
Defined messages 7
anon.
Logged in as anon.
Authenticated Yes
Token class AnonymousToken
Firewall name main
19 ms
Render Time 19 ms
Template Calls 7
Block Calls 5
Macro Calls 0
12 in 180.43 ms
Database Queries 12
Query time 180.43 ms
Invalid entities 0
Second Level Cache disabled
4.4.50
Profiler token 7d829a
Environment dev
Debug enabled
PHP version 7.4.3   View phpinfo()
PHP Extensions xdebug ✗ APCu ✗ OPcache ✓
PHP SAPI apache2handler