Author(s) | David Meldrum |
---|---|
Summary | This document provides information on the present contractual situation of the Technical Coordinator, Ms Hester Viola, and possible options for the future. |
Doc Type | Working Document |
Status | Published on 06 Oct 2008 |
Keywords | DBCP DBCP-24 TC |