GO-SHIP 5 Background-Documents

Author(s) Kramp et al
Summary - GO-SHIP Cruise plans (draft, status 10 Sep 2015) - Design and Status Maps (10 Sep 2015) - Core Measurements and Submission Timelines - Meeting minutes (GO-SHIP teleconferences since 2013, GO-SHIP 4, OCG 6) - Cruise Notice - OOPC Observing System Network/Element Specification (Draft)
Doc Type Working Document
Status Published on 11 Sep 2015
This document is used in the event(s): 5th GO-SHIP Committee Meeting

Group(s): JCOMM
Created at 12:02 on 16 Sep 2015 by Martin Kramp
Updated at 17:25 on 16 Sep 2015 by Martin Kramp