Author(s) | Kramp et al |
---|---|
Summary | - GO-SHIP Cruise plans (draft, status 10 Sep 2015) - Design and Status Maps (10 Sep 2015) - Core Measurements and Submission Timelines - Meeting minutes (GO-SHIP teleconferences since 2013, GO-SHIP 4, OCG 6) - Cruise Notice - OOPC Observing System Network/Element Specification (Draft) |
Doc Type | Working Document |
Status | Published on 11 Sep 2015 |
This document is used in the event(s): |
5th GO-SHIP Committee Meeting
|